Osoyoos service area

Energy Advisor For Osoyoos Builders

Osoyoos energy advisor for Part 9 builders: HOT2000 modelling, Step Code reports, blower-door testing, F280 load support, and as-built files.

One advisor, drawings to occupancy
Jesse Cummings Registered Energy Advisor (NRCan) 250-858-4808 jesse@apollobp.ca

A complete Osoyoos permit package starts with the drawing set the Town will review. Send current planning or building comments with the drawings so the model follows the active design rather than an earlier version of the project.

My Osoyoos work follows three stages: Pre-Construction Energy Modelling and Reporting, Mid Construction Blower Door Testing, and Final As-Built Blower Door Testing and Reporting. A CSA F280 block-load heat-loss and heat-gain calculation is included at no additional charge with every pre-construction compliance package.

Send the drawing set or share link, Osoyoos address, current stage, target date, and Town comments already received. Check the Osoyoos requirement record. I serve Osoyoos and the entire Okanagan region.

Local requirements

Osoyoos permit forms and local requirements can change. Confirm the current application package with the Town building department.

Active design

Model the version the Town is reviewing.

  • Send planning or building comments that changed the plans
  • Provide the window schedule and proposed assemblies
  • Identify mechanical and ventilation selections still in progress
  • Keep approved drawing changes attached to the Step Code file
Airtightness testing

Test while the team can act on the result.

  • Share the site contact and access details
  • Book the mid-construction blower door test (pre-drywall test) while the air barrier remains visible
  • Have the site team available if repairs can be made during the test
  • Book final testing after exterior openings and penetrations are complete
Builder questions

What builders ask before booking.

Does Apollo serve Osoyoos?

Yes. I provide Part 9 energy advisory services for builders in Osoyoos and throughout the Okanagan.

What should I send before modelling?

Send the drawings, address, window and assembly information, mechanical notes, target date, and current Town comments.

Is the F280 block load included?

Yes. A CSA F280 block-load heat-loss and heat-gain calculation is included at no additional charge with every pre-construction compliance package.

When should I book a blower-door visit?

Book mid-construction testing while leaks are accessible, and final testing after the completed envelope is ready.

Should I book a mid-construction blower-door test?

Yes, on most Part 9 builds. I test before drywall and walk the leakage areas with your crew. They can repair accessible leaks before the air barrier is covered.

Request a quote

Send the drawings. Get a clear quote.

Send the drawing set or a share link. Include the address, municipality, current stage, and target dates. I’ll confirm any missing inputs and quote the project by stage.