Energy Advisor Services For Okanagan Builders
Energy advisor services for Okanagan Part 9 builders: Step Code reports, HOT2000, F280, TECA checklists, blower-door testing, and as-built closeout.
Apollo provides the energy advisory scope Part 9 builders need from permit to occupancy. BC guidance describes energy advisors as the people who provide energy modelling and airtightness testing for residential Step Code compliance; Apollo organizes that work around one file, one advisor, and one practical path through the AHJ process.
Use this hub to choose the right starting point. If the project is before permit, start with Step Code compliance reporting, HOT2000 modelling, and any needed CSA F280 calculations or TECA ventilation checklist support. If framing is underway, focus on mid-construction blower-door testing. If the home is close to occupancy, start with final testing and the as-built energy report.
For a quote, send the drawing set or shared drive link, project address, municipality or AHJ, current stage, target permit or inspection date, and any forms or instructions already issued. Apollo will price the base compliance package and any add-ons by stage so the builder knows what is needed now and what can wait.
Blower-Door Airtightness Testing
Blower-door airtightness testing for Penticton Part 9 builders: mid-construction diagnostics, final testing, readiness checks, and as-built reporting support.
Energy Modelling (HOT2000)
HOT2000 energy modelling for Penticton Part 9 builders: permit-stage model inputs, Step Code reports, design coordination, and as-built updates.
CSA F280-12 Heat Loss and Heat Gain
CSA F280-12 heat loss and heat gain calculations for BC Part 9 builders, coordinated with drawings, HOT2000 inputs, TECA ventilation checklist inputs, and equipment selection.
TECA Ventilation Checklist Support
Permit-stage TECA ventilation checklist support, plus optional builder-requested HRV or ERV design only when the project will use that equipment.
BC Energy Step Code Compliance
BC Energy Step Code compliance reports for Part 9 builders: pre-construction modelling, permit documentation, mid-construction checks, and as-built closeout.
As-Built Compliance Reporting
As-built energy reports for BC Part 9 builders: final airtightness results, construction changes, mechanical updates, and occupancy-stage closeout.
Send the drawings and project basics.
Jesse Cummings reviews the file and returns a quote - base compliance package and applicable add-ons, priced by stage - within one business day after receiving the drawings and project basics.