Search a BC city to see its recorded Energy Step Code and Zero Carbon level first, followed by effective dates and the municipal source.
Energy and Zero Carbon levels
Part 9 homes are shown first. Open a city for effective dates, Part 3 requirements, and the municipal source.
No municipality matches that search. Check the spelling or show all municipalities.
Municipality record100 Mile House
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordAbbotsford
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordAlert Bay
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordAnmore
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordArmstrong
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordAshcroft
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordBarriere
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordBelcarra
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective September 27, 2018
- Part 3 - Residential / Commercial
- Step 2Effective September 27, 2018
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordBowen Island
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 3 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective October 1, 2020
- Part 3 - Residential / Commercial
- Step 3Effective October 1, 2020
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordBurnaby
Open for dates and source
Energy Step CodeStep 4Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 2 / EL-4
Energy Step Code
- Part 9 - Residential
- Step 4Effective January 1, 2025
- Part 3 - Residential / Commercial
- Step 2Effective July 1, 2024
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective January 1, 2025
- Part 3 - Residential / Commercial
- EL-4Effective July 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordBurns Lake
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCache Creek
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCampbell River
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCanal Flats
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCastlegar
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCentral Saanich
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective April 1, 2021
- Part 3 - Residential
- Step 3Effective January 4, 2021
- Part 3 - Commercial
- Step 2Effective April 1, 2021
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective November 1, 2024
- Part 3 - Residential / Commercial
- EL-4Effective November 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordChase
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordChetwynd
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordChilliwack
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordClearwater
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordClinton
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordColdstream
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordColwood
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 2 / EL-4
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective March 4, 2024
- Part 3 - Residential
- EL-4Effective July 1, 2024
- Part 3 - Commercial
- EL-4Effective November 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordComox
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCoquitlam
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2024. Confirm the level with the building department.
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCourtenay
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCranbrook
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective August 1, 2021
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCreston
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordCumberland
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordDaajing Giids
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordDawson Creek
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordDelta
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordDuncan
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective July 1, 2024
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordElkford
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordEnderby
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordEsquimalt
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential
- Step 3Effective January 1, 2024
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective January 1, 2024
- Part 3 - Residential
- EL-4Effective July 1, 2024
- Part 3 - Commercial
- EL-4Effective November 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordFernie
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordFort St James
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordFort St John
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordFraser Lake
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordFruitvale
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordGibsons
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordGold River
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordGolden
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective December 16, 2022
- Part 3 - Residential
- Step 2Effective March 2, 2022
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordGrand Forks
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordGranisle
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordGreenwood
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordHarrison Hot Springs
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordHazelton
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordHighlands
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Varies, confirm with building department. / EL-1
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 2, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from January 2, 2023. Confirm the level with the building department.
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordHope
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordHouston
Open for dates and source
Energy Step CodeUnknown, confirm with building department.Part 9 homesZero CarbonUnknown, confirm with building department.Part 9 homes
Part 3Unknown, confirm with building department. / Unknown, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Zero Carbon Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Record updated July 12, 2026
Municipality recordHudson's Hope
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordInvermere
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKamloops
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective January 1, 2022
- Part 3 - Residential
- Step 2Effective January 1, 2022
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKaslo
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKelowna
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective June 1, 2021
- Part 3 - Residential
- Step 3Effective January 1, 2022
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKent
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKeremeos
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKimberley
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordKitimat
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLadysmith
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2026. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- EL-1Effective October 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLake Country
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLake Cowichan
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLangford
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLangley (City)
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLangley (Township)
Open for dates and source
Energy Step CodeStep 4Part 9 homesZero CarbonEL-3Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 4Effective April 1, 2025
- Part 3 - Residential
- Step 3Effective April 1, 2025
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-3Effective April 1, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLantzville
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 2 / EL-4
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective June 30, 2025
- Part 3 - Residential / Commercial
- EL-4Effective June 30, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLillooet
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLions Bay
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLogan Lake
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLumby
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordLytton
Open for dates and source
Energy Step CodeUnknown, confirm with building department.Part 9 homesZero CarbonUnknown, confirm with building department.Part 9 homes
Part 3Unknown, confirm with building department. / Unknown, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Zero Carbon Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Record updated July 12, 2026
Municipality recordMackenzie
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordMaple Ridge
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-3Part 9 homes
Part 3Step 2 / EL-3
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-3Effective July 1, 2025
- Part 3 - Residential / Commercial
- EL-3Effective July 1, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordMasset
Open for dates and source
Energy Step CodeUnknown, confirm with building department.Part 9 homesZero CarbonUnknown, confirm with building department.Part 9 homes
Part 3Unknown, confirm with building department. / Unknown, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Zero Carbon Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Record updated July 12, 2026
Municipality recordMcBride
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordMerritt
Open for dates and source
Energy Step CodeUnknown, confirm with building department.Part 9 homesZero CarbonUnknown, confirm with building department.Part 9 homes
Part 3Unknown, confirm with building department. / Unknown, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Zero Carbon Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Record updated July 12, 2026
Municipality recordMetchosin
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordMidway
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordMission
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordMontrose
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNakusp
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNanaimo
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 3 / EL-4
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 3Effective January 1, 2026
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective July 1, 2024
- Part 3 - Residential / Commercial
- EL-4Effective July 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNelson
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3Step 3 / EL-2
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Step 3Effective January 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- EL-2Effective January 1, 2023
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNew Denver
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNew Hazelton
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNew Westminster
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3Varies, confirm with building department. / Varies, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2025. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from January 1, 2025. Confirm the level with the building department.
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2025. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from January 1, 2025. Confirm the level with the building department.
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNorth Saanich
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNorth Vancouver (City)
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential
- Step 3Effective November 1, 2023
- Part 3 - Commercial
- Step 2Effective November 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordNorth Vancouver (District)
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3Varies, confirm with building department. / Varies, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordOak Bay
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective September 1, 2024
- Part 3 - Residential
- Step 3Effective September 1, 2024
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective September 1, 2024
- Part 3 - Residential
- EL-4Effective September 1, 2024
- Part 3 - Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordOliver
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordOsoyoos
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordParksville
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPeachland
Open for dates and source
Energy Step CodeUnknown, confirm with building department.Part 9 homesZero CarbonUnknown, confirm with building department.Part 9 homes
Part 3Unknown, confirm with building department. / Unknown, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Zero Carbon Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Record updated July 12, 2026
Municipality recordPemberton
Open for dates and source
Energy Step CodeStep 4Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 4Effective January 1, 2021
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPenticton
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPitt Meadows
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective January 1, 2022
- Part 3 - Residential / Commercial
- Step 2Effective January 1, 2022
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPort Alberni
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPort Coquitlam
Open for dates and source
Energy Step CodeStep 4Part 9 homesZero CarbonEL-1Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 4Effective January 1, 2024
- Part 3 - Residential
- Varies, confirm with building department.The source shows conditions from March 1, 2021. Confirm the level with the building department.
- Part 3 - Commercial
- Step 3Effective January 1, 2024
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPort Moody
Open for dates and source
Energy Step CodeStep 4Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 4Effective January 1, 2025
- Part 3 - Residential
- Step 3Effective January 1, 2025
- Part 3 - Commercial
- Step 2Effective January 1, 2025
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective January 1, 2025
- Part 3 - Residential / Commercial
- EL-4Effective January 1, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPowell River
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPrince George
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordPrince Rupert
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordQualicum Beach
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 2 / EL-4
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective January 1, 2025
- Part 3 - Residential / Commercial
- EL-4Effective January 1, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordQuesnel
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordRadium Hot Springs
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordRevelstoke
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective January 1, 2022
- Part 3 - Residential / Commercial
- Step 2Effective January 1, 2022
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordRichmond
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3Varies, confirm with building department. / Varies, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordRossland
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from May 1, 2024. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from May 1, 2024. Confirm the level with the building department.
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSaanich
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective November 1, 2023
- Part 3 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Commercial
- EL-4Effective November 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSalmon Arm
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSechelt
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSicamous
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSidney
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSooke
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSquamish
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from October 25, 2023. Confirm the level with the building department.
- Part 3 - Residential
- Varies, confirm with building department.The source shows conditions from October 25, 2023. Confirm the level with the building department.
- Part 3 - Commercial
- Step 2Effective October 25, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective October 25, 2023
- Part 3 - Residential / Commercial
- EL-4Effective October 25, 2023
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSummerland
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordSurrey
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective April 1, 2019
- Part 3 - Residential
- Step 3Effective April 1, 2019
- Part 3 - Commercial
- Step 2Effective April 1, 2019
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 7, 2023
- Part 3 - Residential / Commercial
- EL-1Effective March 7, 2023
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordTerrace
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordTofino
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordTrail
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordUcluelet
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordValemount
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordVancouver
Open for dates and source
Energy Step CodeUnknown, confirm with building department.Part 9 homesZero CarbonUnknown, confirm with building department.Part 9 homes
Part 3Unknown, confirm with building department. / Unknown, confirm with building department.
Energy Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Zero Carbon Step Code
- Part 9 - Residential
- Unknown, confirm with building department.Unknown, confirm with building department.
- Part 3 - Residential / Commercial
- Unknown, confirm with building department.Unknown, confirm with building department.
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordVanderhoof
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordVernon
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective January 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective April 22, 2024
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordVictoria
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective November 1, 2023
- Part 3 - Residential
- EL-4Effective July 1, 2024
- Part 3 - Commercial
- EL-4Effective November 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordView Royal
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-4Part 9 homes
Part 3Step 2 / EL-4
Energy Step Code
- Part 9 - Residential
- Step 3Effective January 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective January 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-4Effective November 1, 2023
- Part 3 - Residential
- EL-4Effective July 1, 2024
- Part 3 - Commercial
- EL-4Effective November 1, 2024
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordWest Kelowna
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordWest Vancouver
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonVaries, confirm with building department.Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Commercial
- Step 2Effective November 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Residential
- Varies, confirm with building department.The source shows conditions from November 1, 2023. Confirm the level with the building department.
- Part 3 - Commercial
- EL-3Effective November 1, 2023
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordWhistler
Open for dates and source
Energy Step CodeVaries, confirm with building department.Part 9 homesZero CarbonEL-3Part 9 homes
Part 3See residential / commercial levels
Energy Step Code
- Part 9 - Residential
- Varies, confirm with building department.The source shows conditions from January 1, 2024. Confirm the level with the building department.
- Part 3 - Residential
- Step 3Effective January 1, 2024
- Part 3 - Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-3Effective January 1, 2024
- Part 3 - Residential
- EL-3Effective January 1, 2024
- Part 3 - Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordWhite Rock
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Municipality recordWilliams Lake
Open for dates and source
Energy Step CodeStep 3Part 9 homesZero CarbonEL-1Part 9 homes
Part 3Step 2 / EL-1
Energy Step Code
- Part 9 - Residential
- Step 3Effective May 1, 2023
- Part 3 - Residential / Commercial
- Step 2Effective May 1, 2023
Zero Carbon Step Code
- Part 9 - Residential
- EL-1Effective March 10, 2025
- Part 3 - Residential / Commercial
- EL-1Effective March 10, 2025
Record updated July 12, 2026 · Source accessed July 12, 2026
Send the drawings and project address.
I’ll confirm the municipality, current stage, and dates needed to quote the modelling, reports, and testing.
What builders ask before booking.
Which requirement applies to my permit?
The permit application date and the local bylaw determine the requirement. Use this guide as a starting point, then confirm the current level with the building department.
What do Part 9 and Part 3 mean in this guide?
Part 9 generally covers houses and small buildings within the limits of Part 9 of the BC Building Code. Part 3 covers larger or more complex buildings. Confirm the code path with the project designer and building department.
Are these requirements confirmed for my project?
No. The entries summarize dated source records and link to municipal information. Confirm the requirement with the building department for the specific project.
Why can Part 3 show separate residential and commercial levels?
Some municipal records list different Energy Step Code or Zero Carbon Step Code levels for Part 3 residential and commercial occupancies. When they differ, this guide shows both.
This guide summarizes dated public records. The permit application date and bylaws in force determine the requirement, so confirm the active level with the building department.